2025 |
|
„I/42 Brno, VMO Vinohrady – Exploratory Gallery“
Ing. Tomáš Just
|
2025 |
4 |
63 |
 |
|
30th National Conference on Trenchless Technologies
Ing. Jan Frantl
|
2025 |
4 |
57 |
 |
|
Alliance Contracts for Czech Tunnelling Projects?
Dipl.-Ing. Claudia Fiedler, Dipl.-Ing. Sabrina Zupancic, Ing. Barbora Píšová, Ph.D., Dr. Dipl.-Ing. Martin Entacher, CML Construction Services GmbH, Mgr. Vratislav Koníř, STRABAG a.s.
|
2025 |
3 |
15 |
 |
|
Alliance Contracts for Czech Tunnelling Projects?
Dipl.-Ing. Claudia Fiedler, Dipl.-Ing. Sabrina Zupancic, Ing. Barbora Píšová, Ph.D., Dr. Dipl.-Ing. Martin Entacher, CML Construction Services GmbH, Mgr. Vratislav Koníř, STRABAG a.s.
|
2025 |
3 |
15 |
 |
|
Cement Concrete Pavements in Tunnels – Technical and Operational Design Aspects
doc. Ing. Andrea Zuzulová, PhD., STU v Bratislave, Stavebná fakulta
|
2025 |
4 |
21 |
 |
|
Cement Concrete Pavements in Tunnels – Technical and Operational Design Aspects
doc. Ing. Andrea Zuzulová, PhD., STU v Bratislave, Stavebná fakulta
|
2025 |
4 |
21 |
 |
|
Cement Concrete Pavements in Tunnels – Technical and Operational Design Aspects
doc. Ing. Andrea Zuzulová, PhD., STU v Bratislave, Stavebná fakulta
|
2025 |
4 |
21 |
 |
|
Cement Concrete Pavements in Tunnels – Technical and Operational Design Aspects
doc. Ing. Andrea Zuzulová, PhD., STU v Bratislave, Stavebná fakulta
|
2025 |
4 |
21 |
 |
|
Pohůrka Highway Tunnel on the České Budějovice Ring Road
Ing. Tomáš Urbánek, David Benda, Ing. David Krása, METROPROJEKT Praha a.s.
|
2025 |
2 |
4 |
 |
|
Dipl. Ing. Moritz Freyborn, předseda představenstva STRABAG a.s.
Dipl. Ing. Moritz Freyborn
|
2025 |
3 |
2 |
 |
|
WG17 Excursion, Part 1
Ing. Radek Bernard, Ph.D.
|
2025 |
1 |
92 |
 |
|
WG17 Excursion, Part 2
Ing. Radek Bernard, Ph.D.
|
2025 |
2 |
69 |
 |
|
Geotechnical Characterization of Rock Mass During Excavation of the Bukov Underground Research Facility II
Mgr. Lukáš Mareček, Ph.D., SG Geotechnika a.s., Mgr. Lucie Mareda, Správa úložišť radioaktivních odpadů, RNDr. Zita Bukovská, Ph.D., Česká geologická služba, RNDr. Karel Sosna, Ph.D., SG Geotechnika a.s
|
2025 |
1 |
18 |
 |
|
Geotechnical Characterization of Rock Mass During Excavation of the Bukov Underground Research Facility II
Mgr. Lukáš Mareček, Ph.D., SG Geotechnika a.s., Mgr. Lucie Mareda, Správa úložišť radioaktivních odpadů, RNDr. Zita Bukovská, Ph.D., Česká geologická služba, RNDr. Karel Sosna, Ph.D., SG Geotechnika a.s
|
2025 |
1 |
18 |
 |
|
Ing. Jan Korejčík, člen redakční rady
Ing. Jan Korejčík
|
2025 |
4 |
1 |
 |
|
Ing. Jan Loško, PhD., generální ředitel Mott MacDonald CZ, spol. s r.o.
Ing. Jan Loško, PhD.
|
2025 |
2 |
3 |
 |
|
Ing. Martin Čermák, člen redakční rady
Ing. Martin Čermák
|
2025 |
2 |
1 |
 |
|
Ing. Michal Šerák, člen redakční rady
Ing. Michal Šerák
|
2025 |
1 |
1 |
 |
|
Ing. Miroslav Žák, generálny riaditeľ a predseda predstavenstva Marti a.s.
Ing. Miroslav Žák
|
2025 |
4 |
2 |
 |
|
Ing. Radek Bernard, Ph.D., člen redakční rady
Ing. Radek Bernard, Ph.D.
|
2025 |
3 |
1 |
 |
|
Ing. Valerián Horváth, riaditeľ a konateľ spoločnosti, Basler & Hofmann Slovakia s.r.o.
Ing. Valerián Horváth
|
2025 |
1 |
3 |
 |
|
Ing. Vladimír Seidl, předseda představenstva, METROPROJEKT Praha a.s.
Ing. Vladimír Seidl
|
2025 |
2 |
2 |
 |
|
For the 80th Birthday of doc. Ing. Alexandr Rozsypal, Csc.
Víťa Herle
|
2025 |
1 |
87 |
 |
|
Tunnels and Underground Construction Conference 2024
Ing. Miloslav Frankovský
|
2025 |
1 |
76 |
 |
|
Metro D – New Line of Prague Metro
Ing. Boris Šebesta, Ing. Michal Šerák
|
2025 |
1 |
79 |
 |
|
Metro D – New Line of Prague Metro
Ing. Boris Šebesta, Ing. Michal Šerák
|
2025 |
2 |
60 |
 |
|
Metro D – New Line of Prague Metro
Ing. Boris Šebesta, Ing. Michal Šerák
|
2025 |
3 |
67 |
 |
|
Metro D – New Line of Prague Metro
Ing. Boris Šebesta, Ing. Michal Šerák
|
2025 |
4 |
58 |
 |
|
Metro D – Continuing Construction of the Olbrachtova Station
Ing. Václav Dohnálek, Ing. Roman Lutišan, Ing. Štěpán Růžička, STRABAG a.s.
|
2025 |
3 |
4 |
 |
|
Mgr. Lucie Bohátková, obchodní ředitelka SG Geotechnika a.s.
Mgr. Lucie Bohátková
|
2025 |
1 |
2 |
 |
|
Modal Analysis of Tunnel Lining Using Fourier Transofrm
Dipl.-Ing. Juraj Ortuta, Ing. Jozef Šimiček, PhD., Amberg Engineering Slovakia, s.r.o., doc. RNDr. Ing. René Putiška, PhD., RNDr. Ing. Bibiana Brixová, PhD., Prírodovedecká Fakulta Univerzity Komenského v Bratislave
|
2025 |
1 |
60 |
 |
|
Modal Analysis of Tunnel Lining Using Fourier Transofrm
Dipl.-Ing. Juraj Ortuta, Ing. Jozef Šimiček, PhD., Amberg Engineering Slovakia, s.r.o., doc. RNDr. Ing. René Putiška, PhD., RNDr. Ing. Bibiana Brixová, PhD., Prírodovedecká Fakulta Univerzity Komenského v Bratislave
|
2025 |
1 |
60 |
 |
|
Construction Monitoring of the Olbrachtova Station of Metro Line D in Prague
Jakub Bohátka, Mgr. Daniel Horváth, Ing. Milan Kössler, SG Geotechnika a.s.
|
2025 |
1 |
4 |
 |
|
Construction Monitoring of the Olbrachtova Station of Metro Line D in Prague
Jakub Bohátka, Mgr. Daniel Horváth, Ing. Milan Kössler, SG Geotechnika a.s.
|
2025 |
1 |
4 |
 |
|
Design, Structure, and Operation of Mobile Formwork for Cut-and-Cover Tunnels
Ing. Petr Bortlík, Ph.D., OSTROJ a.s.
|
2025 |
4 |
28 |
 |
|
Design, Structure, and Operation of Mobile Formwork for Cut-and-Cover Tunnels
Ing. Petr Bortlík, Ph.D., OSTROJ a.s.
|
2025 |
4 |
28 |
 |
|
Design, Structure, and Operation of Mobile Formwork for Cut-and-Cover Tunnels
Ing. Petr Bortlík, Ph.D., OSTROJ a.s.
|
2025 |
4 |
28 |
 |
|
From Concept to Reality: Construction of Bikoš Tunnel Portals
Ing. Michal Křepela, Basler & Hofmann Slovakia s.r.o., Ing. Matej Gužík, PhD., Štátny geologický ústav Dionýza Štúra
|
2025 |
1 |
51 |
 |
|
From Concept to Reality: Construction of Bikoš Tunnel Portals
Ing. Michal Křepela, Basler & Hofmann Slovakia s.r.o., Ing. Matej Gužík, PhD., Štátny geologický ústav Dionýza Štúra
|
2025 |
1 |
51 |
 |
|
Repair of Drainage Galleries of the Petřín Hill in Prague
Ladislav Adamec, Martin Včelák, POHL cz, a.s.
|
2025 |
3 |
47 |
 |
|
Repair of Drainage Galleries of the Petřín Hill in Prague
Ladislav Adamec, Martin Včelák, POHL cz, a.s.
|
2025 |
3 |
47 |
 |
|
Track Repair in the Tanvald–Kořenov Section
Ing. Jan Frantl
|
2025 |
3 |
70 |
 |
|
Impact of the Excavation of Exploratory Galleries for the Construction of Metro I.D on the Structure of Metro C
Ing. Martin Vinter, Ing. Vojtěch Anderle, INSET s.r.o.
|
2025 |
4 |
36 |
 |
|
Impact of the Excavation of Exploratory Galleries for the Construction of Metro I.D on the Structure of Metro C
Ing. Martin Vinter, Ing. Vojtěch Anderle, INSET s.r.o.
|
2025 |
4 |
36 |
 |
|
Petr Pohl, POHL cz, a.s.
Petr Pohl
|
2025 |
3 |
3 |
 |
|
Picture Postcards with Shipping Tunnels in the United Kingdom of Great Britain and Northern Ireland – Part 2
doc. Ing. Vladislav Horák, CSc., Ing. Milan Majer, Ing. Richard Svoboda, Ph.D.
|
2025 |
1 |
83 |
 |
|
Picture Postcards with Tunnels in the Balkans II
doc. Ing. Vladislav Horák, CSc., Ing. Milan Majer, Ing. Richard Svoboda, Ph.D.
|
2025 |
4 |
68 |
 |
|
Picture Postcards with Tunnels with an Announcement and a Picture Postcard with Tunnel Humour
doc. Ing. Vladislav Horák, CSc., Ing. Milan Majer, Ing. Richard Svoboda, Ph.D.
|
2025 |
3 |
74 |
 |
|
Picture Postcards with the Simplon Tunnel
doc. Ing. Vladislav Horák, CSc., Ing. Milan Majer, Ing. Richard Svoboda, Ph.D.
|
2025 |
2 |
64 |
 |
|
Polish Steel Mining Supports Used in the Reconstruction of the Sewer Tunnel on Sportovní Street in Brno
Ing. David Zuba, D&R Steel s.r.o., Ing. Marek Grodzicki, Huta Łabędy s.a., Ing. Jaromír Zlámal, POHL cz. a.s.
|
2025 |
3 |
40 |
 |
|
Polish Steel Mining Supports Used in the Reconstruction of the Sewer Tunnel on Sportovní Street in Brno
Ing. David Zuba, D&R Steel s.r.o., Ing. Marek Grodzicki, Huta Łabędy s.a., Ing. Jaromír Zlámal, POHL cz. a.s.
|
2025 |
3 |
40 |
 |
|
Portals and Cut&Cover Sections of Tunnel Beroun
Ing. Petr Makásek, Ph.D., Ing. Petr Havlan, Mott MacDonald CZ, spol. s r.o.
|
2025 |
2 |
42 |
 |
|
Portals and Cut&Cover Sections of Tunnel Beroun
Ing. Petr Makásek, Ph.D., Ing. Petr Havlan, Mott MacDonald CZ, spol. s r.o.
|
2025 |
2 |
42 |
 |
|
Fire Safety in Tunnels 2024
Ing. Vlastimil Horák
|
2025 |
1 |
79 |
 |
|
Breakthrough of the Brenner Base Tunnel Exploratory Gallery
Ing. Libor Mařík
|
2025 |
4 |
51 |
 |
|
Forty-Five Years Ago, the Swiss Gotthard Road Tunnel Was Put into Operation
prof. Ing. Jiří Barták, DrSc.
|
2025 |
3 |
64 |
 |
|
The Preparation of the Podřipsko High-Speed Railway Line
Dr.-Ing. Zdeněk Žižka, Ing. Petr Hofman, METROPROJEKT Praha a.s.
|
2025 |
2 |
20 |
 |
|
The Preparation of the Podřipsko High-Speed Railway Line
Dr.-Ing. Zdeněk Žižka, Ing. Petr Hofman, METROPROJEKT Praha a.s.
|
2025 |
2 |
20 |
 |
|
Ražba druhé trouby silničního tunelu Gotthard zahájena
Ing. Filip Jiřičný
|
2025 |
2 |
59 |
 |
|
Excavation by a Microtunneling Machine of Utility Tunnel at the Kolín Railway Station
Ing. Markéta Venclová, Ing. Pavel Čeliš Ph.D., Ing. Petr Hybský, Ing. Filip Jiřičný, Metrostav TBR a.s.
|
2025 |
3 |
53 |
 |
|
Excavation by a Microtunneling Machine of Utility Tunnel at the Kolín Railway Station
Ing. Markéta Venclová, Ing. Pavel Čeliš Ph.D., Ing. Petr Hybský, Ing. Filip Jiřičný, Metrostav TBR a.s.
|
2025 |
3 |
53 |
 |
|
Reconstruction of the Dolnolučanský Tunnel on the Liberec Harrachov Railway Line
Ing. Karel Flemr, Ing. Jan Frantl
|
2025 |
3 |
69 |
 |
|
Reconstruction of the Dolnolučanský Tunnel on the Liberec Harrachov Railway Line
Ing. Karel Flemr, Ing. Jan Frantl
|
2025 |
4 |
58 |
 |
|
Reconstruction of the Main Ventilation of the Prague Metro
Ing. Miroslav Novák, Ing. Pavel Uhrin, METROPROJEKT Praha a.s.
|
2025 |
2 |
31 |
 |
|
Reconstruction of the Main Ventilation of the Prague Metro
Ing. Miroslav Novák, Ing. Pavel Uhrin, METROPROJEKT Praha a.s.
|
2025 |
2 |
31 |
 |
|
Reconstruction of the Main Ventilation of the Prague Metro
Ing. Miroslav Novák, Ing. Pavel Uhrin, METROPROJEKT Praha a.s.
|
2025 |
2 |
31 |
 |
|
Revitalization of Jiřího z Poděbrad Metro Station and Construction of Barrier-Free Access – Contractor's Experience
Ing. Petr Velička, Ing. Jan Panuška, STRABAG a.s.
|
2025 |
3 |
24 |
 |
|
Revitalization of Jiřího z Poděbrad Metro Station and Construction of Barrier-Free Access – Contractor's Experience
Ing. Petr Velička, Ing. Jan Panuška, STRABAG a.s.
|
2025 |
3 |
24 |
 |
|
Robotics in the Underground 2025
Ing. Jiří Bendl
|
2025 |
3 |
66 |
 |
|
Specific Problems of the Čebrať Tunnel Excavation
Ing. Peter Bóna, Ing. Alexandra Jacková, Basler & Hofmann Slovakia s.r.o.
|
2025 |
1 |
37 |
 |
|
Čebrať Tunnel
Ing. Róbert Zwilling, Ing. Peter Čulík, Ing. Miloslav Frankovský
|
2025 |
1 |
82 |
 |
|
Čebrať Tunnel
Ing. Róbert Zwilling, Ing. Peter Čulík
|
2025 |
2 |
63 |
 |
|
Tunnel Dolní Radechová – a Key Element of the Náchod Bypass
Ing. Michal Maričák, Marti a.s.
|
2025 |
4 |
3 |
 |
|
Homole Tunnel
Ing. Andrej Korba, Ing. Boris Čillik, Marti a.s.
|
2025 |
4 |
13 |
 |
|
Okruhliak Tunnel
Ing. Róbert Zwilling, Ing. Peter Čulík, Ing. Miloslav Frankovský
|
2025 |
1 |
81 |
 |
|
Okruhliak Tunnel
Ing. Róbert Zwilling, Ing. Peter Čulík
|
2025 |
2 |
62 |
 |
|
Okruhliak Tunnel
Ing. Róbert Zwilling, Ing. Martin Smolka
|
2025 |
3 |
72 |
 |
|
Okruhliak Tunnel
Ing. Róbert Zwilling, Ing. Miloslav Frankovský, Ing. Martin Smolka
|
2025 |
4 |
64 |
 |
|
Rajhrad Tunnel on the RS2 High Speed Line
Ing. Aleš Veverka, Ing. Katarína Révay, Mott MacDonald CZ spol. s r.o.
|
2025 |
2 |
35 |
 |
|
Rajhrad Tunnel on the RS2 High Speed Line
Ing. Aleš Veverka, Ing. Katarína Révay, Mott MacDonald CZ spol. s r.o.
|
2025 |
2 |
35 |
 |
|
Španí Háj Tunnel
Ing. Róbert Zwilling, Ing. Martin Smolka
|
2025 |
3 |
73 |
 |
|
Španí Háj Tunnel
Ing. Róbert Zwilling, Ing. Miloslav Frankovský, Ing. Martin Smolka
|
2025 |
4 |
65 |
 |
|
Višňové Tunnel
Ing. Róbert Zwilling, Ing. Peter Čulík, Ing. Miloslav Frankovský
|
2025 |
1 |
83 |
 |
|
Tunnelling Afternoon 1/2025
Ing. Karel Rössler, Ph.D.
|
2025 |
2 |
59 |
 |
|
Tunelling Afternoon 2/2025 – Operation of Tunnels and Feedback from Practice
Ing. Ladislav Štefan
|
2025 |
4 |
56 |
 |
|
Tunnel Afternoon 4/2024
prof. Ing. Matouš Hilar, Ph.D.
|
2025 |
1 |
77 |
 |
|
The Fréjus Tunnels in the Light of Medals
doc. Ing. Vladislav Horák, CSc.
|
2025 |
4 |
53 |
 |
|
Tunnels on Motorway Network
Ing. Róbert Zwilling, Ing. Peter Čulík, Ing. Miloslav Frankovský
|
2025 |
1 |
81 |
 |
|
Tunnels on Motorway Network
Ing. Róbert Zwilling, Ing. Peter Čulík
|
2025 |
2 |
62 |
 |
|
Tunnels on Motorway Network
Ing. Róbert Zwilling, Ing. Martin Smolka
|
2025 |
3 |
72 |
 |
|
Tunnels on Motorway Network
Ing. Róbert Zwilling, Ing. Miloslav Frankovský, Ing. Martin Smolka
|
2025 |
4 |
64 |
 |
|
Tunnels on the Railway Network
Ing. Róbert Zwilling, Ing. Martin Smolka
|
2025 |
3 |
73 |
 |
|
Tunnels on the Railway Network
Ing. Róbert Zwilling, Ing. Miloslav Frankovský, Ing. Martin Smolka
|
2025 |
4 |
65 |
 |
|
Hight Speed Rail Tunnels in Prague-Běchovice Area
Ing. Petr Makásek, Ph.D., Ing. Michal Hnilička, Mott MacDonald CZ, spol. s r.o.
|
2025 |
2 |
49 |
 |
|
Hight Speed Rail Tunnels in Prague-Běchovice Area
Ing. Petr Makásek, Ph.D., Ing. Michal Hnilička, Mott MacDonald CZ, spol. s r.o.
|
2025 |
2 |
49 |
 |
|
ÚČOV – Adding a Diversion, Gallery Excavation, Sliplining and Fitting with Fibreglass Pipes
Jiří Měšťan, Ing. Jaromír Zlámal, POHL cz, a.s.
|
2025 |
3 |
33 |
 |
|
ÚČOV – Adding a Diversion, Gallery Excavation, Sliplining and Fitting with Fibreglass Pipes
Jiří Měšťan, Ing. Jaromír Zlámal, POHL cz, a.s.
|
2025 |
3 |
33 |
 |
|
ÚČOV – Adding a Diversion, Gallery Excavation, Sliplining and Fitting with Fibreglass Pipes
Jiří Měšťan, Ing. Jaromír Zlámal, POHL cz, a.s.
|
2025 |
3 |
33 |
 |
|
200 Years Have Passed Since the Birth of Czech Geologist Jan Krejčí
prof. Ing. Jiří Barták, DrSc.
|
2025 |
4 |
66 |
 |
|
General Assembly of CzTA ITA-AITES
Ing. Markéta Prušková, Ph.D.
|
2025 |
3 |
77 |
 |
|
A Large Delay Between Commencement and Completion of the Construction of the Vinohrady II Tunnel
prof. Ing. Jiří Barták, DrSc.
|
2025 |
1 |
73 |
 |
|
Pavements of Road Tunnels
Ing. Marián Kováčik, Basler & Hofmann Slovakia, s.r.o.
|
2025 |
1 |
45 |
 |
|
Pavements of Road Tunnels
Ing. Marián Kováčik, Basler & Hofmann Slovakia, s.r.o.
|
2025 |
1 |
45 |
 |
|
Pavements of Road Tunnels
Ing. Marián Kováčik, Basler & Hofmann Slovakia, s.r.o.
|
2025 |
1 |
45 |
 |
|
HG and TS20 Utility Tunnel Construction at the Václav Havel Airport in Prague
Ing. Radek Bernard, Ph.D.
|
2025 |
4 |
61 |
 |
|
A New Publication ”Geophysics for Underground Engineering“ Was Published
doc. RNDr. Pavel Bláha, DrSc.
|
2025 |
1 |
76 |
 |
|
Remembering Ing. Miloš Hrachovec
Ing. Milan Pavlič
|
2025 |
2 |
68 |
 |
|
WTC 2025 In Stockholm
Ing. Karel Rössler, Ph.D.
|
2025 |
3 |
65 |
 |
|
Commencement of the Construction „I/42 Brno, VMO Vinohrady – Exploratory Gallery“
Ing. Tomáš Just
|
2025 |
2 |
61 |
 |
|
Securing Age-Old Mines in Conditions of Mining Districts
Ing. Martin Šefrna, SG Geotechnika a.s.
|
2025 |
1 |
25 |
 |
|
Securing Age-Old Mines in Conditions of Mining Districts
Ing. Martin Šefrna, SG Geotechnika a.s.
|
2025 |
1 |
25 |
 |