2013 |
Workshop Geotechnical Design Using Eurocode 7 (not only) for Roads
Ing. Vítězslav Herle
|
2013 |
1 |
136 |
 |
150 let od zhájení provozu londýnského metra a 170. výročí dokončení prvního londýnského tunelu pod Temží
Ing. Miloslav Novotný
|
2013 |
3 |
76 |
 |
60th Birhday Anniversary of Ing. Vladislav Horák, CSc.
doc. RNDr. Eva Hrubešová, Ph.D.
|
2013 |
2 |
80 |
 |
62nd Geomechanical Colloquy in Salzburg
Ing. Miloslav Novotný
|
2013 |
4 |
103 |
 |
Road Tunnels on Faore Islands
Ing. Jana Chabroňová
|
2013 |
1 |
137 |
 |
Czech Representative in the International Tunnelling Awards Finals
Ing. Tomáš Ebermann, Ph.D.
|
2013 |
4 |
100 |
 |
Activity of Tunnelling Section of the Czech Road Society in 2012 and its Plans for 2013
Ing. Jiří Smolík
|
2013 |
1 |
144 |
 |
Článek v časopise Zakládání
Ing. Tomáš Ebermann, Ph.D.
|
2013 |
2 |
69 |
 |
D8 Motorway – Construction Lot 805: Lovosice–Řehlovice
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
4 |
106 |
 |
D8 Motorway – Construction Lot 805: Lovosice–Řehlovice
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
|
2013 |
1 |
141 |
 |
D8 Motorway – Construction Lot 805: Lovosice–Řehlovice
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
2 |
75 |
 |
D8 Motorway – Construction Lot 805: Lovosice–Řehlovice
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
3 |
84 |
 |
Final Structures of Mined Sections of Blanka Complex of Tunnels
Ing. Pavel Šourek, Ing. Lukáš Grünwald, Ing. Vladimír Petržílka, Ing. Jan Kvaš, MBA, Ing. Miroslav Padevět
|
2013 |
1 |
16 |
 |
Long Highway Tunnels in Indian Himalaya under Construction
Ing. Martin Srb, doc. Ing. Matouš Hilar, Ph.D., Ing. Petr Svoboda
|
2013 |
2 |
31 |
 |
doc. Ing. Alexandr Rozsypal, CSc.
doc. Ing. Alexandr Rozsypal, CSc.
|
2013 |
1 |
1 |
 |
Completion of Modernisation of Votice – Benešov u Prahy Railway Track
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
3 |
84 |
 |
Double-Track Tunnels on the 5th Extension of Metro Line A Dejvická – Motol; Excavation and Final Lining
Ing. Gottlieb Blažek
|
2013 |
4 |
19 |
 |
Double-Track Tunnels on the 5th Extension of Metro Line A Dejvická – Motol; Excavation and Final Lining
Ing. Gottlieb Blažek
|
2013 |
4 |
19 |
 |
Geological and Geotechnical Ground Investigation for New Semmering Base Tunnel in Austria
Mag. Robert Vanek, Mag. Dr. Alfred Fasching
|
2013 |
2 |
18 |
 |
The history and present of NATM in the Czech Republic
Ing. Libor Mařík
|
2013 |
1 |
83 |
 |
Ing. David Krása
Ing. David Krása
|
2013 |
4 |
3 |
 |
Ing. Jan Václavík Octogenarian
Ing. Ludvík Šajtar
|
2013 |
4 |
117 |
 |
Ing. Jan Vintera
Ing. Jan Vintera
|
2013 |
4 |
1 |
 |
Ing. Jan Vintera Turns Sixty
Ing. Karel Franczyk, Ph.D.
|
2013 |
1 |
140 |
 |
Ing. Jaromír Zlámal
Ing. Jaromír Zlámal
|
2013 |
2 |
1 |
 |
Ing. Juraj Androvic
Ing. Juraj Androvic
|
2013 |
1 |
3 |
 |
Ing. Martin Doksanský
Ing. Martin Doksanský
|
2013 |
3 |
2 |
 |
Ing. Martin Srb
Ing. Martin Srb
|
2013 |
2 |
3 |
 |
Ing. Ondřej Fuchs
Ing. Ondřej Fuchs
|
2013 |
2 |
2 |
 |
Ing. Pavel Pilát
Ing. Pavel Pilát
|
2013 |
1 |
2 |
 |
Ing. Štefan Choma Septuagenarian
Ing. Miloslav Frankovský
|
2013 |
4 |
116 |
 |
Ing. Tomáš Bílek
Ing. Tomáš Bílek
|
2013 |
4 |
2 |
 |
Ing. Tomáš Ebermann
Ing. Tomáš Ebermann
|
2013 |
3 |
1 |
 |
Ing. Vlastimil Horák
Ing. Vlastimil Horák
|
2013 |
3 |
3 |
 |
How to Efficiently Allocate the Risk of Unforeseeable Physical Conditions in Undergrond Construction?
JUDr. Lukáš Klee, Ph.D., LL.M, MBA, Mgr. David Hruška
|
2013 |
3 |
51 |
 |
How to Efficiently Allocate the Risk of Unforeseeable Physical Conditions in Undergrond Construction?
JUDr. Lukáš Klee, Ph.D., LL.M, MBA, Mgr. David Hruška
|
2013 |
3 |
51 |
 |
How to Efficiently Allocate the Risk of Unforeseeable Physical Conditions in Undergrond Construction?
JUDr. Lukáš Klee, Ph.D., LL.M, MBA, Mgr. David Hruška
|
2013 |
3 |
51 |
 |
ITA-COSUF Steering Board Meeting in Prague
Ing. Jiří Smolík, Ing. Ludvík Šajtar
|
2013 |
4 |
106 |
 |
The Gotthard Base Rail Tunnel Conference
Ing. Petra Kolilová, Ing. Milan Sliacký, Ing. Lukáš Týfa, Ph.D.
|
2013 |
2 |
74 |
 |
Intersections with Roads and Watercourses During the Gazela Natural Gas Transit Pipeline
Ing. Igor Fryč
|
2013 |
4 |
75 |
 |
Intersections with Roads and Watercourses During the Gazela Natural Gas Transit Pipeline
Ing. Igor Fryč
|
2013 |
4 |
75 |
 |
Länsimetro – development of Karhusaari Track Section
Ing. Václav Pavlovský, Ing. Aleš Gothard, Ing. Martin Petrášek
|
2013 |
1 |
30 |
 |
Metro Baku: Complicated Interconnection of Green Line at 28 May Station
Ing. Jan Čeněk, Ing. Jan Korejčík, Ing. Petr Makásek
|
2013 |
4 |
63 |
 |
Metro Baku: Complicated Interconnection of Green Line at 28 May Station
Ing. Jan Čeněk, Ing. Jan Korejčík, Ing. Petr Makásek
|
2013 |
4 |
63 |
 |
Sofia Metro Diameter III
Ing. Jiří Úlehla, Ing. Tomáš Pekárek, Ing. Vladimír Seidl, Ing. Aleš Menšík, Ing. Otakar Hasík
|
2013 |
4 |
47 |
 |
International Seminar on Consolidation, Reductin of Permeability and Anchoring of Rock Mass and Civil Ingeneering Structures 2013
doc. RNDr. Eva Hrubešová, Ph.D.
|
2013 |
1 |
135 |
 |
Modernisation of Railway Corridor IV in Tábor – Sudoměřice u Tábora Section
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
3 |
84 |
 |
Modernisation of Rokycany – Plzeň Railway Track Section
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
4 |
106 |
 |
Mozaika ze světa
Ing. Miloslav Novotný
|
2013 |
4 |
101 |
 |
Mozaika ze světa
Ing. Miloslav Novotný
|
2013 |
3 |
77 |
 |
Nant De Drance, Challenges in the Construction of A 900 MW- Pumped-Storage Hydropower Scheme in the Alps
Sebastian Jung
|
2013 |
4 |
70 |
 |
NATM – From a Construction Method to a System
Prof. Wulf Schubert, Dipl. Ing. Harald Laufer
|
2013 |
2 |
25 |
 |
Design for Access Shafts on New Semmering Base Tunnel
Ing. Jan Rožek, Ing. Ondřej Jágr, DI Oliver Kai Wagner
|
2013 |
3 |
36 |
 |
Tunnel Adits Design of Cable Tunnel in Singapore
Ing. Tomáš Zítko, CEng. Kurt Zeidler, Ph.D.
|
2013 |
3 |
63 |
 |
Tunnel Adits Design of Cable Tunnel in Singapore
Ing. Tomáš Zítko, CEng. Kurt Zeidler, Ph.D.
|
2013 |
3 |
63 |
 |
The New Solution for the Improvement of Tunnel´s Safety
Ing. Tomáš Šmerda
|
2013 |
2 |
67 |
 |
Technical Excursion of the ITA-AITES Czech Tunnelling Association to a Repository for Radioactive Waste in Hungary
Ing. Tomáš Ebermann, Ph.D.
|
2013 |
4 |
120 |
 |
Perspectives of Development of Traffic and Transportation Tunnels in Slovakia
Ing. Miloslav Frankovský, Ing. Ján Kušnír
|
2013 |
1 |
37 |
 |
Perspectives of Development of Traffic and Transportation Tunnels in Slovakia
Ing. Miloslav Frankovský, Ing. Ján Kušnír
|
2013 |
1 |
37 |
 |
The Fehmarnbelt Immersed Tube Tunnel
Susanne K. Pedersen, Antonius J. H. Hemel, Steen Lykke
|
2013 |
3 |
44 |
 |
Plzeň – Úslava River Interceptor Sewer
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
4 |
106 |
 |
Plzeň – Úslava River Interceptor Sewer
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
3 |
84 |
 |
Plzeň – Úslava River Interceptor Sewer
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
|
2013 |
1 |
141 |
 |
Plzeň – Úslava River Interceptor Sewer
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
2 |
75 |
 |
Podzemní stavby časopise Beton
doc. Ing. Vladislav Horák, CSc.
|
2013 |
2 |
68 |
 |
The Increased Use of Underground Space Needs
Martin Knights
|
2013 |
1 |
118 |
 |
The Increased Use of Underground Space Needs
Martin Knights
|
2013 |
1 |
51 |
 |
Flood Prevention Mesures for Jablonec nad Nisou
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
4 |
106 |
 |
Flood Prevention Mesures for Jablonec nad Nisou
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
|
2013 |
1 |
141 |
 |
Flood Prevention Mesures for Jablonec nad Nisou
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
2 |
75 |
 |
Flood Prevention Mesures for Jablonec nad Nisou
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
3 |
84 |
 |
Prague Geotechnical Days 2013
doc. Ing. Alexandr Rozsypal,CSc.
|
2013 |
3 |
79 |
 |
Grouting for Soil Improvement and Waterproofing: Groutmaster SR10 and Selected Case Histories
Carla L. Zenti, Jozef Sňahničan
|
2013 |
1 |
59 |
 |
Grouting for Soil Improvement and Waterproofing: Groutmaster SR10 and Selected Case Histories
Carla L. Zenti, Jozef Sňahničan
|
2013 |
1 |
59 |
 |
Grouting for Soil Improvement and Waterproofing: Groutmaster SR10 and Selected Case Histories
Carla L. Zenti, Jozef Sňahničan
|
2013 |
1 |
59 |
 |
Metro Line No. 5 Extension
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
4 |
106 |
 |
Metro Line No. 5 Extension
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
2 |
75 |
 |
Metro Line No. 5 Extension
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
3 |
84 |
 |
Metro Line No. 5 Extension
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
|
2013 |
1 |
141 |
 |
Design and Realisation of Rehabilitation of Domašov and Jívová Tunnels Lining
Ing. Lubomír Kosík, Ing. Jaroslav Lacina
|
2013 |
3 |
27 |
 |
Bunji Hydropower Project in Northern Pakistan
Ing. Aristotelis Caravanas
|
2013 |
4 |
86 |
 |
Skid Resistance Properties of Roadway Surface in Tunnels
Ing. Ladislav Štefan, Ing. Radek Dragoun
|
2013 |
4 |
4 |
 |
Skid Resistance Properties of Roadway Surface in Tunnels
Ing. Ladislav Štefan, Ing. Radek Dragoun
|
2013 |
4 |
4 |
 |
Skid Resistance Properties of Roadway Surface in Tunnels
Ing. Ladislav Štefan, Ing. Radek Dragoun
|
2013 |
4 |
4 |
 |
First Phase of Microtunnelling for the Úslava River Interceptor Sewer in Plzeň
Ing. Karel Franczyk, Ph.D., Ing. Martin Matuška
|
2013 |
2 |
13 |
 |
Book on Kralovopolsky Tunnel, Brno
doc. Dr. Ing Jan Pruška
|
2013 |
1 |
139 |
 |
Tunnelling Work on a Sewer in the Municipal District of Prague-Čakovice
Ing. Milan Kössler
|
2013 |
2 |
78 |
 |
Mined Drainage Gallery of Šance Water Works
Ing. Jaroslav Lacina, Ing. Lubomír Kosík
|
2013 |
2 |
19 |
 |
Driving Single-track Tunnels of Prague Metro V.A using Earth Pressure Balance Shields
Ing. David Cyroň, Ing. Petr Hybský, Ing. Karel Rössler, Ph.D., Ing. Štefan Ivor, Ing. Jan Prajer
|
2013 |
1 |
4 |
 |
Rewiev, Impacts, H Index...and what Farther?
doc. Dr. Ing. Jan Pruška
|
2013 |
2 |
81 |
 |
Rekonstrukce Simplonského železničnho tunelu Bázový železniční tunel Semmering Výstavba druhé trouby Gotthardského automobilového tunelu
Ing. Miloslav Novotný
|
2013 |
2 |
67 |
 |
Reconstruction of Střelná Tunnel on Vsetín – Púchov Railway Line
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
4 |
106 |
 |
Solution to Escape Route for Hencnava Tunnel
Ing. Ján Boltvan, Ing. arch. Róbert Mrštica
|
2013 |
1 |
45 |
 |
Construction Lots within Myslbekova – Pelc-Tyrolka Section of the City Circle Road (Blanka Tunnel)
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
4 |
106 |
 |
Construction Lots within Myslbekova – Pelc-Tyrolka Section of the City Circle Road (Blanka Tunnel)
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
|
2013 |
1 |
141 |
 |
Construction Lots within Myslbekova – Pelc-Tyrolka Section of the City Circle Road (Blanka Tunnel)
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
2 |
75 |
 |
Construction Lots within Myslbekova – Pelc-Tyrolka Section of the City Circle Road (Blanka Tunnel)
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
3 |
84 |
 |
Slovak Tunnelling Association ITA-AITES Report
Ing Jozef Frankovský
|
2013 |
1 |
146 |
 |
Ing. Jiří Růžička, Ing. Miroslav Kochánek, Petr Višňák
5th Extension of Prague Metro Line – Petřiny Station
|
2013 |
4 |
37 |
 |
5th Extension of Prague Metro Line – Petřiny Station
Ing. Jiří Růžička, Ing. Miroslav Kochánek, Petr Višňák
|
2013 |
4 |
37 |
 |
World Tunnel Congress WTC 2013 and 39th ITA-AITES General Assembly
Ing. Miloslav Novotný, Ing. Markéta Prušková, Ph.D.
|
2013 |
3 |
80 |
 |
Sixty Years by SUDOP
Ing. Karel Závora, Ing Roman Smida, Ing. Michal Gramblička
|
2013 |
4 |
110 |
 |
Heat Supply Line, Prague; Mined Gallery Passage under the Vltava River
RNDr. Radovan Chmelař, Mgr. Libor Síla, Ing. Jan Sochůrek, Ing. Tomáš Just
|
2013 |
2 |
53 |
 |
Thermal Loading Action on Final Linings of Underground Structures
Ing. Lukáš Ďuriš, prof. Ing. Josef Aldorf, DrSc., Ing. Jiří Gérik
|
2013 |
2 |
44 |
 |
Three-Quarter Century Anniversary of Jirka Smolík
Ing. Karel Franczyk, Ph.D.
|
2013 |
2 |
79 |
 |
Tunel Bancarevo
Ing. Boris Šebesta, Ing. Jan Vintera
|
2013 |
3 |
78 |
 |
Bancarevo Tunnel in Serbia
Ing. Jan Vintera
|
2013 |
4 |
100 |
 |
Pol′ana and Svrčinovec Tunnel
Ing. Miloslav Frankovský
|
2013 |
4 |
110 |
 |
Šibenik Tunnel
Ing. Miloslav Frankovský
|
2013 |
4 |
110 |
 |
Šibenik Tunnel
Ing. Miloslav Frankovský
|
2013 |
2 |
78 |
 |
Šibenik Tunnel
Ing. Miloslav Frankovský
|
2013 |
3 |
88 |
 |
Tunnel Afternoon 1/2013
Ing. Markéta Prušková, Ph.D.
|
2013 |
2 |
73 |
 |
Tunnel Afternoon 2/2013
Ing. Markéta Prušková, Ph.D.
|
2013 |
4 |
102 |
 |
Tunnel Afternoon 3/2012
Ing. Markéta Prušková, Ph.D.
|
2013 |
1 |
134 |
 |
Blanka Complex of Tunnels – Realisation of Invert of Final Lining of Mined Triple-Lane Tunnel
Ing. Libor Stefan
|
2013 |
3 |
9 |
 |
Complex of Tunnels – Surface Finishing of Diaphragm Walls in Cut-and-Cover Tunnels
Ing. Libor Stefan
|
2013 |
3 |
14 |
 |
SMP CZ a.s. Pariticipation in Realisation of 5th Extension of Metro Line A (metro V.A) from Dejvická Station to Motol
Petr Jelínek
|
2013 |
3 |
4 |
 |
General Assembly or the CzTA ITA-AITES
Ing. Miloslav Novotný
|
2013 |
3 |
89 |
 |
Influence of the Interface Element Properties used to Modeling of the Buried Structures
Ing. Jan Grepl
|
2013 |
2 |
37 |
 |
Prague Metro construction – past, present and future
Ing. Ermín Stehlík
|
2013 |
1 |
69 |
 |
Construction of the Mined Part of Nádraží Veleslavín Station on the 5th Extension of Prague Metro Line A
Ing. Jan Panuška, Miroslav Chyba, Ing. Václav Dohnálek, Ing. Petr Chamra
|
2013 |
2 |
4 |
 |
Construction of Bořislavka Station on the 5th Extension of Metro Line A
Ing. Vít Pastrňák
|
2013 |
4 |
8 |
 |
Development of D1 Motorway Containing Tunnels
Ing. Miloslav Frankovský
|
2013 |
1 |
145 |
 |
The Use of a Utility Tunnel Lining Condition Survey Report for Assessing Interaction with Pile Foundation
doc. Ing. Vladislav Horák, CSc., Ing. Hynek Janků, Ing. Miroslav Lipka
|
2013 |
4 |
54 |
 |
The Use of a Utility Tunnel Lining Condition Survey Report for Assessing Interaction with Pile Foundation
doc. Ing. Vladislav Horák, CSc., Ing. Hynek Janků, Ing. Miroslav Lipka
|
2013 |
4 |
54 |
 |
The Use of a Utility Tunnel Lining Condition Survey Report for Assessing Interaction with Pile Foundation
doc. Ing. Vladislav Horák, CSc., Ing. Hynek Janků, Ing. Miroslav Lipka
|
2013 |
4 |
54 |
 |
Looking Back at Ing. Josef Zajíc, CSc.
doc. Ing. Alexandr Rozsypal, CSc.
|
2013 |
4 |
118 |
 |
The law of large numbers in underground construction – Risk Management for MegaProjects – Lessons learned from the Gotthard Base Tunnel
Heinz Ehrbar
|
2013 |
1 |
101 |
 |
Easing Traffic Flow on the North-South Backbone Road Between the Nusle Bridge and the National Museum
Ing. Jiří Růžička, Ing. Jan Kykal
|
2013 |
4 |
31 |
 |
Experience from Design the Construction of Mined Stations on an Extension of Prague Metro Line A
Ing. Jiří Růžička
|
2013 |
1 |
51 |
 |
Experience from Design the Construction of Mined Stations on an Extension of Prague Metro Line A
Ing. Jiří Růžička
|
2013 |
1 |
51 |
 |
Změny v organizaci časopisu
doc. Ing. Matouš Hilar, Ph.D.
|
2013 |
2 |
82 |
 |
Jablunkov No. 2 Railway Tunnel
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
|
2013 |
1 |
141 |
 |
Prof. Ing. Josef Aldorf, Dr.Sc., Anniversary
doc. RNDr. Eva Hrubešová, Ph.D.
|
2013 |
3 |
88 |
 |