Contents of past years' copies


Title / Author Year Number Page  

 
2013

Workshop Geotechnical Design Using Eurocode 7 (not only) for Roads
Ing. Vítězslav Herle
2013 1 136
150 let od zhájení provozu londýnského metra a 170. výročí dokončení prvního londýnského tunelu pod Temží
Ing. Miloslav Novotný
2013 3 76
60th Birhday Anniversary of Ing. Vladislav Horák, CSc.
doc. RNDr. Eva Hrubešová, Ph.D.
2013 2 80
62nd Geomechanical Colloquy in Salzburg
Ing. Miloslav Novotný
2013 4 103
Road Tunnels on Faore Islands
Ing. Jana Chabroňová
2013 1 137
Czech Representative in the International Tunnelling Awards Finals
Ing. Tomáš Ebermann, Ph.D.
2013 4 100
Activity of Tunnelling Section of the Czech Road Society in 2012 and its Plans for 2013
Ing. Jiří Smolík
2013 1 144
Článek v časopise Zakládání
Ing. Tomáš Ebermann, Ph.D.
2013 2 69
D8 Motorway – Construction Lot 805: Lovosice–Řehlovice
Ing. Boris Šebesta, Ing. Jan Vintera
2013 4 106
D8 Motorway – Construction Lot 805: Lovosice–Řehlovice
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
2013 1 141
D8 Motorway – Construction Lot 805: Lovosice–Řehlovice
Ing. Boris Šebesta, Ing. Jan Vintera
2013 2 75
D8 Motorway – Construction Lot 805: Lovosice–Řehlovice
Ing. Boris Šebesta, Ing. Jan Vintera
2013 3 84
Final Structures of Mined Sections of Blanka Complex of Tunnels
Ing. Pavel Šourek, Ing. Lukáš Grünwald, Ing. Vladimír Petržílka, Ing. Jan Kvaš, MBA, Ing. Miroslav Padevět
2013 1 16
Long Highway Tunnels in Indian Himalaya under Construction
Ing. Martin Srb, doc. Ing. Matouš Hilar, Ph.D., Ing. Petr Svoboda
2013 2 31
doc. Ing. Alexandr Rozsypal, CSc.
doc. Ing. Alexandr Rozsypal, CSc.
2013 1 1
Completion of Modernisation of Votice – Benešov u Prahy Railway Track
Ing. Boris Šebesta, Ing. Jan Vintera
2013 3 84
Double-Track Tunnels on the 5th Extension of Metro Line A Dejvická – Motol; Excavation and Final Lining
Ing. Gottlieb Blažek
2013 4 19
Double-Track Tunnels on the 5th Extension of Metro Line A Dejvická – Motol; Excavation and Final Lining
Ing. Gottlieb Blažek
2013 4 19
Geological and Geotechnical Ground Investigation for New Semmering Base Tunnel in Austria
Mag. Robert Vanek, Mag. Dr. Alfred Fasching
2013 2 18
The history and present of NATM in the Czech Republic
Ing. Libor Mařík
2013 1 83
Ing. David Krása
Ing. David Krása
2013 4 3
Ing. Jan Václavík Octogenarian
Ing. Ludvík Šajtar
2013 4 117
Ing. Jan Vintera
Ing. Jan Vintera
2013 4 1
Ing. Jan Vintera Turns Sixty
Ing. Karel Franczyk, Ph.D.
2013 1 140
Ing. Jaromír Zlámal
Ing. Jaromír Zlámal
2013 2 1
Ing. Juraj Androvic
Ing. Juraj Androvic
2013 1 3
Ing. Martin Doksanský
Ing. Martin Doksanský
2013 3 2
Ing. Martin Srb
Ing. Martin Srb
2013 2 3
Ing. Ondřej Fuchs
Ing. Ondřej Fuchs
2013 2 2
Ing. Pavel Pilát
Ing. Pavel Pilát
2013 1 2
Ing. Štefan Choma Septuagenarian
Ing. Miloslav Frankovský
2013 4 116
Ing. Tomáš Bílek
Ing. Tomáš Bílek
2013 4 2
Ing. Tomáš Ebermann
Ing. Tomáš Ebermann
2013 3 1
Ing. Vlastimil Horák
Ing. Vlastimil Horák
2013 3 3
How to Efficiently Allocate the Risk of Unforeseeable Physical Conditions in Undergrond Construction?
JUDr. Lukáš Klee, Ph.D., LL.M, MBA, Mgr. David Hruška
2013 3 51
How to Efficiently Allocate the Risk of Unforeseeable Physical Conditions in Undergrond Construction?
JUDr. Lukáš Klee, Ph.D., LL.M, MBA, Mgr. David Hruška
2013 3 51
How to Efficiently Allocate the Risk of Unforeseeable Physical Conditions in Undergrond Construction?
JUDr. Lukáš Klee, Ph.D., LL.M, MBA, Mgr. David Hruška
2013 3 51
ITA-COSUF Steering Board Meeting in Prague
Ing. Jiří Smolík, Ing. Ludvík Šajtar
2013 4 106
The Gotthard Base Rail Tunnel Conference
Ing. Petra Kolilová, Ing. Milan Sliacký, Ing. Lukáš Týfa, Ph.D.
2013 2 74
Intersections with Roads and Watercourses During the Gazela Natural Gas Transit Pipeline
Ing. Igor Fryč
2013 4 75
Intersections with Roads and Watercourses During the Gazela Natural Gas Transit Pipeline
Ing. Igor Fryč
2013 4 75
Länsimetro – development of Karhusaari Track Section
Ing. Václav Pavlovský, Ing. Aleš Gothard, Ing. Martin Petrášek
2013 1 30
Metro Baku: Complicated Interconnection of Green Line at 28 May Station
Ing. Jan Čeněk, Ing. Jan Korejčík, Ing. Petr Makásek
2013 4 63
Metro Baku: Complicated Interconnection of Green Line at 28 May Station
Ing. Jan Čeněk, Ing. Jan Korejčík, Ing. Petr Makásek
2013 4 63
Sofia Metro Diameter III
Ing. Jiří Úlehla, Ing. Tomáš Pekárek, Ing. Vladimír Seidl, Ing. Aleš Menšík, Ing. Otakar Hasík
2013 4 47
International Seminar on Consolidation, Reductin of Permeability and Anchoring of Rock Mass and Civil Ingeneering Structures 2013
doc. RNDr. Eva Hrubešová, Ph.D.
2013 1 135
Modernisation of Railway Corridor IV in Tábor – Sudoměřice u Tábora Section
Ing. Boris Šebesta, Ing. Jan Vintera
2013 3 84
Modernisation of Rokycany – Plzeň Railway Track Section
Ing. Boris Šebesta, Ing. Jan Vintera
2013 4 106
Mozaika ze světa
Ing. Miloslav Novotný
2013 4 101
Mozaika ze světa
Ing. Miloslav Novotný
2013 3 77
Nant De Drance, Challenges in the Construction of A 900 MW- Pumped-Storage Hydropower Scheme in the Alps
Sebastian Jung
2013 4 70
NATM – From a Construction Method to a System
Prof. Wulf Schubert, Dipl. Ing. Harald Laufer
2013 2 25
Design for Access Shafts on New Semmering Base Tunnel
Ing. Jan Rožek, Ing. Ondřej Jágr, DI Oliver Kai Wagner
2013 3 36
Tunnel Adits Design of Cable Tunnel in Singapore
Ing. Tomáš Zítko, CEng. Kurt Zeidler, Ph.D.
2013 3 63
Tunnel Adits Design of Cable Tunnel in Singapore
Ing. Tomáš Zítko, CEng. Kurt Zeidler, Ph.D.
2013 3 63
The New Solution for the Improvement of Tunnel´s Safety
Ing. Tomáš Šmerda
2013 2 67
Technical Excursion of the ITA-AITES Czech Tunnelling Association to a Repository for Radioactive Waste in Hungary
Ing. Tomáš Ebermann, Ph.D.
2013 4 120
Perspectives of Development of Traffic and Transportation Tunnels in Slovakia
Ing. Miloslav Frankovský, Ing. Ján Kušnír
2013 1 37
Perspectives of Development of Traffic and Transportation Tunnels in Slovakia
Ing. Miloslav Frankovský, Ing. Ján Kušnír
2013 1 37
The Fehmarnbelt Immersed Tube Tunnel
Susanne K. Pedersen, Antonius J. H. Hemel, Steen Lykke
2013 3 44
Plzeň – Úslava River Interceptor Sewer
Ing. Boris Šebesta, Ing. Jan Vintera
2013 4 106
Plzeň – Úslava River Interceptor Sewer
Ing. Boris Šebesta, Ing. Jan Vintera
2013 3 84
Plzeň – Úslava River Interceptor Sewer
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
2013 1 141
Plzeň – Úslava River Interceptor Sewer
Ing. Boris Šebesta, Ing. Jan Vintera
2013 2 75
Podzemní stavby časopise Beton
doc. Ing. Vladislav Horák, CSc.
2013 2 68
The Increased Use of Underground Space Needs
Martin Knights
2013 1 118
The Increased Use of Underground Space Needs
Martin Knights
2013 1 51
Flood Prevention Mesures for Jablonec nad Nisou
Ing. Boris Šebesta, Ing. Jan Vintera
2013 4 106
Flood Prevention Mesures for Jablonec nad Nisou
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
2013 1 141
Flood Prevention Mesures for Jablonec nad Nisou
Ing. Boris Šebesta, Ing. Jan Vintera
2013 2 75
Flood Prevention Mesures for Jablonec nad Nisou
Ing. Boris Šebesta, Ing. Jan Vintera
2013 3 84
Prague Geotechnical Days 2013
doc. Ing. Alexandr Rozsypal,CSc.
2013 3 79
Grouting for Soil Improvement and Waterproofing: Groutmaster SR10 and Selected Case Histories
Carla L. Zenti, Jozef Sňahničan
2013 1 59
Grouting for Soil Improvement and Waterproofing: Groutmaster SR10 and Selected Case Histories
Carla L. Zenti, Jozef Sňahničan
2013 1 59
Grouting for Soil Improvement and Waterproofing: Groutmaster SR10 and Selected Case Histories
Carla L. Zenti, Jozef Sňahničan
2013 1 59
Metro Line No. 5 Extension
Ing. Boris Šebesta, Ing. Jan Vintera
2013 4 106
Metro Line No. 5 Extension
Ing. Boris Šebesta, Ing. Jan Vintera
2013 2 75
Metro Line No. 5 Extension
Ing. Boris Šebesta, Ing. Jan Vintera
2013 3 84
Metro Line No. 5 Extension
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
2013 1 141
Design and Realisation of Rehabilitation of Domašov and Jívová Tunnels Lining
Ing. Lubomír Kosík, Ing. Jaroslav Lacina
2013 3 27
Bunji Hydropower Project in Northern Pakistan
Ing. Aristotelis Caravanas
2013 4 86
Skid Resistance Properties of Roadway Surface in Tunnels
Ing. Ladislav Štefan, Ing. Radek Dragoun
2013 4 4
Skid Resistance Properties of Roadway Surface in Tunnels
Ing. Ladislav Štefan, Ing. Radek Dragoun
2013 4 4
Skid Resistance Properties of Roadway Surface in Tunnels
Ing. Ladislav Štefan, Ing. Radek Dragoun
2013 4 4
First Phase of Microtunnelling for the Úslava River Interceptor Sewer in Plzeň
Ing. Karel Franczyk, Ph.D., Ing. Martin Matuška
2013 2 13
Book on Kralovopolsky Tunnel, Brno
doc. Dr. Ing Jan Pruška
2013 1 139
Tunnelling Work on a Sewer in the Municipal District of Prague-Čakovice
Ing. Milan Kössler
2013 2 78
Mined Drainage Gallery of Šance Water Works
Ing. Jaroslav Lacina, Ing. Lubomír Kosík
2013 2 19
Driving Single-track Tunnels of Prague Metro V.A using Earth Pressure Balance Shields
Ing. David Cyroň, Ing. Petr Hybský, Ing. Karel Rössler, Ph.D., Ing. Štefan Ivor, Ing. Jan Prajer
2013 1 4
Rewiev, Impacts, H Index...and what Farther?
doc. Dr. Ing. Jan Pruška
2013 2 81
Rekonstrukce Simplonského železničnho tunelu Bázový železniční tunel Semmering Výstavba druhé trouby Gotthardského automobilového tunelu
Ing. Miloslav Novotný
2013 2 67
Reconstruction of Střelná Tunnel on Vsetín – Púchov Railway Line
Ing. Boris Šebesta, Ing. Jan Vintera
2013 4 106
Solution to Escape Route for Hencnava Tunnel
Ing. Ján Boltvan, Ing. arch. Róbert Mrštica
2013 1 45
Construction Lots within Myslbekova – Pelc-Tyrolka Section of the City Circle Road (Blanka Tunnel)
Ing. Boris Šebesta, Ing. Jan Vintera
2013 4 106
Construction Lots within Myslbekova – Pelc-Tyrolka Section of the City Circle Road (Blanka Tunnel)
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
2013 1 141
Construction Lots within Myslbekova – Pelc-Tyrolka Section of the City Circle Road (Blanka Tunnel)
Ing. Boris Šebesta, Ing. Jan Vintera
2013 2 75
Construction Lots within Myslbekova – Pelc-Tyrolka Section of the City Circle Road (Blanka Tunnel)
Ing. Boris Šebesta, Ing. Jan Vintera
2013 3 84
Slovak Tunnelling Association ITA-AITES Report
Ing Jozef Frankovský
2013 1 146
Ing. Jiří Růžička, Ing. Miroslav Kochánek, Petr Višňák
5th Extension of Prague Metro Line – Petřiny Station
2013 4 37
5th Extension of Prague Metro Line – Petřiny Station
Ing. Jiří Růžička, Ing. Miroslav Kochánek, Petr Višňák
2013 4 37
World Tunnel Congress WTC 2013 and 39th ITA-AITES General Assembly
Ing. Miloslav Novotný, Ing. Markéta Prušková, Ph.D.
2013 3 80
Sixty Years by SUDOP
Ing. Karel Závora, Ing Roman Smida, Ing. Michal Gramblička
2013 4 110
Heat Supply Line, Prague; Mined Gallery Passage under the Vltava River
RNDr. Radovan Chmelař, Mgr. Libor Síla, Ing. Jan Sochůrek, Ing. Tomáš Just
2013 2 53
Thermal Loading Action on Final Linings of Underground Structures
Ing. Lukáš Ďuriš, prof. Ing. Josef Aldorf, DrSc., Ing. Jiří Gérik
2013 2 44
Three-Quarter Century Anniversary of Jirka Smolík
Ing. Karel Franczyk, Ph.D.
2013 2 79
Tunel Bancarevo
Ing. Boris Šebesta, Ing. Jan Vintera
2013 3 78
Bancarevo Tunnel in Serbia
Ing. Jan Vintera
2013 4 100
Pol′ana and Svrčinovec Tunnel
Ing. Miloslav Frankovský
2013 4 110
Šibenik Tunnel
Ing. Miloslav Frankovský
2013 4 110
Šibenik Tunnel
Ing. Miloslav Frankovský
2013 2 78
Šibenik Tunnel
Ing. Miloslav Frankovský
2013 3 88
Tunnel Afternoon 1/2013
Ing. Markéta Prušková, Ph.D.
2013 2 73
Tunnel Afternoon 2/2013
Ing. Markéta Prušková, Ph.D.
2013 4 102
Tunnel Afternoon 3/2012
Ing. Markéta Prušková, Ph.D.
2013 1 134
Blanka Complex of Tunnels – Realisation of Invert of Final Lining of Mined Triple-Lane Tunnel
Ing. Libor Stefan
2013 3 9
Complex of Tunnels – Surface Finishing of Diaphragm Walls in Cut-and-Cover Tunnels
Ing. Libor Stefan
2013 3 14
SMP CZ a.s. Pariticipation in Realisation of 5th Extension of Metro Line A (metro V.A) from Dejvická Station to Motol
Petr Jelínek
2013 3 4
General Assembly or the CzTA ITA-AITES
Ing. Miloslav Novotný
2013 3 89
Influence of the Interface Element Properties used to Modeling of the Buried Structures
Ing. Jan Grepl
2013 2 37
Prague Metro construction – past, present and future
Ing. Ermín Stehlík
2013 1 69
Construction of the Mined Part of Nádraží Veleslavín Station on the 5th Extension of Prague Metro Line A
Ing. Jan Panuška, Miroslav Chyba, Ing. Václav Dohnálek, Ing. Petr Chamra
2013 2 4
Construction of Bořislavka Station on the 5th Extension of Metro Line A
Ing. Vít Pastrňák
2013 4 8
Development of D1 Motorway Containing Tunnels
Ing. Miloslav Frankovský
2013 1 145
The Use of a Utility Tunnel Lining Condition Survey Report for Assessing Interaction with Pile Foundation
doc. Ing. Vladislav Horák, CSc., Ing. Hynek Janků, Ing. Miroslav Lipka
2013 4 54
The Use of a Utility Tunnel Lining Condition Survey Report for Assessing Interaction with Pile Foundation
doc. Ing. Vladislav Horák, CSc., Ing. Hynek Janků, Ing. Miroslav Lipka
2013 4 54
The Use of a Utility Tunnel Lining Condition Survey Report for Assessing Interaction with Pile Foundation
doc. Ing. Vladislav Horák, CSc., Ing. Hynek Janků, Ing. Miroslav Lipka
2013 4 54
Looking Back at Ing. Josef Zajíc, CSc.
doc. Ing. Alexandr Rozsypal, CSc.
2013 4 118
The law of large numbers in underground construction – Risk Management for MegaProjects – Lessons learned from the Gotthard Base Tunnel
Heinz Ehrbar
2013 1 101
Easing Traffic Flow on the North-South Backbone Road Between the Nusle Bridge and the National Museum
Ing. Jiří Růžička, Ing. Jan Kykal
2013 4 31
Experience from Design the Construction of Mined Stations on an Extension of Prague Metro Line A
Ing. Jiří Růžička
2013 1 51
Experience from Design the Construction of Mined Stations on an Extension of Prague Metro Line A
Ing. Jiří Růžička
2013 1 51
Změny v organizaci časopisu
doc. Ing. Matouš Hilar, Ph.D.
2013 2 82
Jablunkov No. 2 Railway Tunnel
Ing. Boris Šebesta, Ing. Karel Franczyk, Ph.D.
2013 1 141
Prof. Ing. Josef Aldorf, Dr.Sc., Anniversary
doc. RNDr. Eva Hrubešová, Ph.D.
2013 3 88

   

Advanced search